top of page
CFA (Continuous Flight Augering) Piles
This method is capable of achieving high drilling performances. It consists of penetrating the ground using a continuous helix as a tool. After filling to the design depth, the concrete is poured using an internal tube that carries the drill bit from the bottom of the pile to the top. Then the reinforcing steel is placed, sometimes requiring vibration to be able to place it.
Pilotes CFA
Pilotes CFA
1/1
bottom of page